FHWA NBI 2024 Inspection record Public-domain dataset

PELICAN STRAND BVD

Carrying PELICAN STRAND BVD over COCOHATCHEE CANAL

30FT N OF CR 846 W OF I75, Collier, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
70 t Inventory load rating

Bridge Snapshot: PELICAN STRAND BVD

The PELICAN STRAND BVD bridge in Collier, Florida carries PELICAN STRAND BVD over COCOHATCHEE CANAL. It was built in 1997, making it 29 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 22.4 meters (73 feet) end to end. Daily traffic averages 250 vehicles, placing it in the lower-traffic tier of Florida bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 69.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PELICAN STRAND BVD compares

▲ 30.7
Load rating vs Florida average (38.9 t)
Top 5%
Higher load rating than 95% of Florida bridges
310
Bridges in Collier · 7 in Poor condition
PELICAN STRAND BVD 69.6 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
95.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
26.9
Essentiality /15
15.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
69.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Material
Concrete
Number of Spans
3
Structure Length
22.4 m (73 ft)
Deck Width
22.1 m (73 ft)
Owner
County Highway Agency
Avg Daily Traffic
250 vehicles/day
Structure Number
034038

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PELICAN STRAND BVD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PELICAN STRAND BVD against other structures in Collier and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PELICAN STRAND BVD?

PELICAN STRAND BVD in Collier, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PELICAN STRAND BVD inspected?

PELICAN STRAND BVD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 250 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PELICAN STRAND BVD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PELICAN STRAND BVD?

PELICAN STRAND BVD has an NBI inventory load rating of 69.6 metric tons.

Who is responsible for maintaining PELICAN STRAND BVD?

PELICAN STRAND BVD is owned and maintained by County Highway Agency.

How old is PELICAN STRAND BVD and does age affect safety?

PELICAN STRAND BVD was built in 1997, making it 29 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.