FHWA NBI 2024 Inspection record Public-domain dataset

CORONADO PKWY EB

Carrying CORONADO PKWY EB over CORONADO CANAL

0.2MI E of SANTA BARBARA, Collier, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating

Bridge Snapshot: CORONADO PKWY EB

The CORONADO PKWY EB bridge in Collier, Florida carries CORONADO PKWY EB over CORONADO CANAL. It was built in 1972, making it 54 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 26.8 meters (88 feet) end to end. Daily traffic averages 1,440 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 31.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CORONADO PKWY EB compares

▼ 7.6
Load rating vs Florida average (38.9 t)
Bottom 29%
Lower load rating than 71% of Florida bridges
310
Bridges in Collier · 7 in Poor condition
CORONADO PKWY EB 31.3 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
79.5 / 100 - historical 50–79.9 band
Structural adequacy /55
54.6
Serviceability /30
11.0
Essentiality /15
14.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
31.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Material
Prestressed Concrete
Number of Spans
3
Structure Length
26.8 m (88 ft)
Deck Width
9.4 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,440 vehicles/day
Structure Number
034102

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether CORONADO PKWY EB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CORONADO PKWY EB against other structures in Collier and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CORONADO PKWY EB?

CORONADO PKWY EB in Collier, Florida has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CORONADO PKWY EB inspected?

CORONADO PKWY EB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,440 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CORONADO PKWY EB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CORONADO PKWY EB?

CORONADO PKWY EB has an NBI inventory load rating of 31.3 metric tons.

Who is responsible for maintaining CORONADO PKWY EB?

CORONADO PKWY EB is owned and maintained by County Highway Agency.

How old is CORONADO PKWY EB and does age affect safety?

CORONADO PKWY EB was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.