FHWA NBI 2024 Inspection record Public-domain dataset

200 SOUTH STREET

Carrying 200 SOUTH STREET over JORDAN RIVER

1200 WEST 200 SOUTH, SLC, Salt Lake, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
30 t Inventory load rating

Bridge Snapshot: 200 SOUTH STREET

The 200 SOUTH STREET bridge in Salt Lake, Utah carries 200 SOUTH STREET over JORDAN RIVER. It was built in 1956, making it 70 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 20.4 meters (67 feet) end to end. Daily traffic averages 4,596 vehicles, placing it in the moderately-trafficked tier of Utah bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 29.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 200 SOUTH STREET compares

▼ 7.3
Load rating vs Utah average (36.8 t)
Bottom 37%
Lower load rating than 63% of Utah bridges
659
Bridges in Salt Lake · 18 in Poor condition
200 SOUTH STREET 29.5 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
63.7 / 100 - historical 50–79.9 band
Structural adequacy /55
28.4
Serviceability /30
24.3
Essentiality /15
14.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
29.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1956
Material
Prestressed Concrete
Number of Spans
1
Structure Length
20.4 m (67 ft)
Deck Width
17.9 m (59 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,596 vehicles/day
Structure Number
035100F

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

200 SOUTH STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare 200 SOUTH STREET against other structures in Salt Lake and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 200 SOUTH STREET?

200 SOUTH STREET in Salt Lake, Utah has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is 200 SOUTH STREET inspected?

200 SOUTH STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,596 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 200 SOUTH STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 200 SOUTH STREET?

200 SOUTH STREET has an NBI inventory load rating of 29.5 metric tons.

Who is responsible for maintaining 200 SOUTH STREET?

200 SOUTH STREET is owned and maintained by City/Municipal Highway Agency.

How old is 200 SOUTH STREET and does age affect safety?

200 SOUTH STREET was built in 1956, making it 70 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.