FHWA NBI 2024 Inspection record Public-domain dataset

HARP PIKE

Carrying HARP PIKE over MARSHALL BRANCH

3.0 MI N OF KY 12, Franklin, Kentucky

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
39 t Inventory load rating

Bridge Snapshot: HARP PIKE

The HARP PIKE bridge in Franklin, Kentucky carries HARP PIKE over MARSHALL BRANCH. It was built in 1986, making it 40 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.6 meters (38 feet) end to end. Daily traffic averages 249 vehicles, placing it in the lower-traffic tier of Kentucky bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 39.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HARP PIKE compares

▲ 0.0
Load rating vs Kentucky average (39.2 t)
Bottom 47%
Lower load rating than 53% of Kentucky bridges
117
Bridges in Franklin · 11 in Poor condition
HARP PIKE 39.2 t
Kentucky average 39.2 t

Live comparison across Kentucky.

Historical Sufficiency Rating

PlainBridge-computed
56.3 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
13.3
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
39.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1986
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.6 m (38 ft)
Deck Width
6.4 m (21 ft)
Owner
County Highway Agency
Avg Daily Traffic
249 vehicles/day
Structure Number
037C00036N

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

HARP PIKE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HARP PIKE against other structures in Franklin and across Kentucky. Kentucky bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HARP PIKE?

HARP PIKE in Franklin, Kentucky has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is HARP PIKE inspected?

HARP PIKE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 249 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HARP PIKE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HARP PIKE?

HARP PIKE has an NBI inventory load rating of 39.2 metric tons.

Who is responsible for maintaining HARP PIKE?

HARP PIKE is owned and maintained by County Highway Agency.

How old is HARP PIKE and does age affect safety?

HARP PIKE was built in 1986, making it 40 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.