FHWA NBI 2024 Inspection record Public-domain dataset

LFCC O&M West

Carrying LFCC O&M West over LFCC

Lemitar, NM, Socorro, New Mexico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
34 t Inventory load rating

Bridge Snapshot: LFCC O&M West

The LFCC O&M West bridge in Socorro, New Mexico carries LFCC O&M West over LFCC. It was built in 1995, making it 31 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 25.1 meters (82 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of New Mexico bridges. It is owned and maintained by Bureau of Reclamation.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 34.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LFCC O&M West compares

▼ 0.5
Load rating vs New Mexico average (34.8 t)
Top 27%
Higher load rating than 73% of New Mexico bridges
20
Bridges in Socorro
LFCC O&M West 34.3 t
New Mexico average 34.8 t

Live comparison across New Mexico.

Historical Sufficiency Rating

PlainBridge-computed
90.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
20.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
34.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Prestressed Concrete
Number of Spans
1
Structure Length
25.1 m (82 ft)
Deck Width
6.4 m (21 ft)
Owner
Bureau of Reclamation
Avg Daily Traffic
10 vehicles/day
Structure Number
0401-S07

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether LFCC O&M West is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LFCC O&M West against other structures in Socorro and across New Mexico. New Mexico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LFCC O&M West?

LFCC O&M West in Socorro, New Mexico has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is LFCC O&M West inspected?

LFCC O&M West's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LFCC O&M West is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LFCC O&M West?

LFCC O&M West has an NBI inventory load rating of 34.3 metric tons.

Who is responsible for maintaining LFCC O&M West?

LFCC O&M West is owned and maintained by Bureau of Reclamation.

How old is LFCC O&M West and does age affect safety?

LFCC O&M West was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.