FHWA NBI 2024 Inspection record Public-domain dataset

FOREST RD 80082

Carrying FOREST RD 80082 over HENRY'S FORK RIVER

15.5 MI. FROM LONETREE,WY, Summit, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: FOREST RD 80082

The FOREST RD 80082 bridge in Summit, Utah carries FOREST RD 80082 over HENRY'S FORK RIVER. It was built in 2009, making it 17 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Utah bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FOREST RD 80082 compares

▼ 4.1
Load rating vs Utah average (36.8 t)
Top 47%
Higher load rating than 53% of Utah bridges
138
Bridges in Summit · 6 in Poor condition
FOREST RD 80082 32.7 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
74.2 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
15.0
Essentiality /15
12.2
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
4.9 m (16 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
041904000013484

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FOREST RD 80082 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FOREST RD 80082 against other structures in Summit and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FOREST RD 80082?

FOREST RD 80082 in Summit, Utah has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is FOREST RD 80082 inspected?

FOREST RD 80082's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FOREST RD 80082 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FOREST RD 80082?

FOREST RD 80082 has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining FOREST RD 80082?

FOREST RD 80082 is owned and maintained by U.S. Forest Service.

How old is FOREST RD 80082 and does age affect safety?

FOREST RD 80082 was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.