FHWA NBI 2024 Inspection record Public-domain dataset

EAGLE TUNNEL RD

Carrying EAGLE TUNNEL RD over CSX RAILROAD

.9 MI W JCT KY 467, Grant, Kentucky

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
76 t Inventory load rating

Bridge Snapshot: EAGLE TUNNEL RD

The EAGLE TUNNEL RD bridge in Grant, Kentucky carries EAGLE TUNNEL RD over CSX RAILROAD. It was built in 2013, making it 13 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 130.8 meters (429 feet) end to end. Daily traffic averages 49 vehicles, placing it in the lower-traffic tier of Kentucky bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 76.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How EAGLE TUNNEL RD compares

▲ 37.2
Load rating vs Kentucky average (39.2 t)
Top 3%
Higher load rating than 97% of Kentucky bridges
79
Bridges in Grant · 5 in Poor condition
EAGLE TUNNEL RD 76.4 t
Kentucky average 39.2 t

Live comparison across Kentucky.

Historical Sufficiency Rating

PlainBridge-computed
99.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
76.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Steel Continuous
Number of Spans
2
Structure Length
130.8 m (429 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
49 vehicles/day
Structure Number
041C00043N

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether EAGLE TUNNEL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare EAGLE TUNNEL RD against other structures in Grant and across Kentucky. Kentucky bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for EAGLE TUNNEL RD?

EAGLE TUNNEL RD in Grant, Kentucky has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is EAGLE TUNNEL RD inspected?

EAGLE TUNNEL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 49 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. EAGLE TUNNEL RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for EAGLE TUNNEL RD?

EAGLE TUNNEL RD has an NBI inventory load rating of 76.4 metric tons.

Who is responsible for maintaining EAGLE TUNNEL RD?

EAGLE TUNNEL RD is owned and maintained by County Highway Agency.

How old is EAGLE TUNNEL RD and does age affect safety?

EAGLE TUNNEL RD was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.