FHWA NBI 2024 Inspection record Public-domain dataset

200 WEST STREET

Carrying 200 WEST STREET over WEBER-PROVO DIV. CANAL

100 N. 200 W. IN KAMAS, Summit, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
20 t Inventory load rating

Bridge Snapshot: 200 WEST STREET

The 200 WEST STREET bridge in Summit, Utah carries 200 WEST STREET over WEBER-PROVO DIV. CANAL. It was built in 1945, making it 81 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 7.7 meters (25 feet) end to end. Daily traffic averages 126 vehicles, placing it in the lower-traffic tier of Utah bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 19.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 200 WEST STREET compares

▼ 17.0
Load rating vs Utah average (36.8 t)
Bottom 15%
Lower load rating than 85% of Utah bridges
138
Bridges in Summit · 6 in Poor condition
200 WEST STREET 19.8 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
69.4 / 100 - historical 50–79.9 band
Structural adequacy /55
30.4
Serviceability /30
27.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1945
Material
Prestressed Concrete
Number of Spans
1
Structure Length
7.7 m (25 ft)
Deck Width
8.6 m (28 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
126 vehicles/day
Structure Number
043030F

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether 200 WEST STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 200 WEST STREET against other structures in Summit and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 200 WEST STREET?

200 WEST STREET in Summit, Utah has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is 200 WEST STREET inspected?

200 WEST STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 126 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 200 WEST STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 200 WEST STREET?

200 WEST STREET has an NBI inventory load rating of 19.8 metric tons.

Who is responsible for maintaining 200 WEST STREET?

200 WEST STREET is owned and maintained by City/Municipal Highway Agency.

How old is 200 WEST STREET and does age affect safety?

200 WEST STREET was built in 1945, making it 81 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.