FHWA NBI 2024 Inspection record Public-domain dataset

SCHAFER RD

Carrying SCHAFER RD over ROB ROY CK

BY ELDAMAIN RD, Kendall, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
26 t Inventory load rating

Bridge Snapshot: SCHAFER RD

The SCHAFER RD bridge in Kendall, Illinois carries SCHAFER RD over ROB ROY CK. It was built in 1978, making it 48 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 16.8 meters (55 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SCHAFER RD compares

▼ 8.7
Load rating vs Illinois average (34.6 t)
Bottom 15%
Lower load rating than 85% of Illinois bridges
133
Bridges in Kendall · 16 in Poor condition
SCHAFER RD 25.9 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
50.1 / 100 - historical 50–79.9 band
Structural adequacy /55
24.6
Serviceability /30
14.0
Essentiality /15
14.5
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Prestressed Concrete
Number of Spans
1
Structure Length
16.8 m (55 ft)
Deck Width
8.2 m (27 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
047309900000000

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

SCHAFER RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SCHAFER RD against other structures in Kendall and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SCHAFER RD?

SCHAFER RD in Kendall, Illinois has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SCHAFER RD inspected?

SCHAFER RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SCHAFER RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SCHAFER RD?

SCHAFER RD has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining SCHAFER RD?

SCHAFER RD is owned and maintained by Town/Township Highway Agency.

How old is SCHAFER RD and does age affect safety?

SCHAFER RD was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.