FHWA NBI 2024 Inspection record Public-domain dataset

IL 120 WB

Carrying IL 120 WB over DES PLAINES RIVER

2.5 M W OF US 41, Lake, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
35 t Inventory load rating

Bridge Snapshot: IL 120 WB

The IL 120 WB bridge in Lake, Illinois carries IL 120 WB over DES PLAINES RIVER. It was built in 1959, making it 67 years old today. It was last reconstructed in 2024, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 53.3 meters (175 feet) end to end. Daily traffic averages 30,700 vehicles, placing it in the heavily-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 34.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IL 120 WB compares

▲ 0.1
Load rating vs Illinois average (34.6 t)
Top 31%
Higher load rating than 69% of Illinois bridges
286
Bridges in Lake · 22 in Poor condition
IL 120 WB 34.7 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
52.0 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
7.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Last Reconstructed
2024
Material
Steel Continuous
Number of Spans
3
Structure Length
53.3 m (175 ft)
Deck Width
10.4 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
30,700 vehicles/day
Structure Number
049004700000000

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

IL 120 WB is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare IL 120 WB against other structures in Lake and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IL 120 WB?

IL 120 WB in Lake, Illinois has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is IL 120 WB inspected?

IL 120 WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IL 120 WB is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IL 120 WB?

IL 120 WB has an NBI inventory load rating of 34.7 metric tons.

Who is responsible for maintaining IL 120 WB?

IL 120 WB is owned and maintained by State Highway Agency.

How old is IL 120 WB and does age affect safety?

IL 120 WB was built in 1959, making it 67 years old and last reconstructed in 2024.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.