FHWA NBI 2024 Inspection record Public-domain dataset

800 SOUTH STREET

Carrying 800 SOUTH STREET over PROVO RIVER

1080 EAST 800 SOUTH, OREM, Utah, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating

Bridge Snapshot: 800 SOUTH STREET

The 800 SOUTH STREET bridge in Utah, Utah carries 800 SOUTH STREET over PROVO RIVER. It was built in 1960, making it 66 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 19.8 meters (65 feet) end to end. Daily traffic averages 14,608 vehicles, placing it in the heavily-trafficked tier of Utah bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 39.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 800 SOUTH STREET compares

▲ 2.7
Load rating vs Utah average (36.8 t)
Top 29%
Higher load rating than 71% of Utah bridges
271
Bridges in Utah · 3 in Poor condition
800 SOUTH STREET 39.5 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
97.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
12.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Last Reconstructed
2000
Material
Prestressed Concrete
Number of Spans
1
Structure Length
19.8 m (65 ft)
Deck Width
21.3 m (70 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
14,608 vehicles/day
Structure Number
049025F

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether 800 SOUTH STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 800 SOUTH STREET against other structures in Utah and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 800 SOUTH STREET?

800 SOUTH STREET in Utah, Utah has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 800 SOUTH STREET inspected?

800 SOUTH STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,608 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 800 SOUTH STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 800 SOUTH STREET?

800 SOUTH STREET has an NBI inventory load rating of 39.5 metric tons.

Who is responsible for maintaining 800 SOUTH STREET?

800 SOUTH STREET is owned and maintained by City/Municipal Highway Agency.

How old is 800 SOUTH STREET and does age affect safety?

800 SOUTH STREET was built in 1960, making it 66 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.