FHWA NBI 2024 Inspection record Public-domain dataset

OREM CITY ROAD

Carrying OREM CITY ROAD over PROVO RIVER

NEAR MURDOCK DIVISION DAM, Utah, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: OREM CITY ROAD

The OREM CITY ROAD bridge in Utah, Utah carries OREM CITY ROAD over PROVO RIVER. It was built in 1992, making it 34 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 20.5 meters (67 feet) end to end. Daily traffic averages 242 vehicles, placing it in the lower-traffic tier of Utah bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OREM CITY ROAD compares

▼ 4.4
Load rating vs Utah average (36.8 t)
Bottom 46%
Lower load rating than 54% of Utah bridges
271
Bridges in Utah · 3 in Poor condition
OREM CITY ROAD 32.4 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
90.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
12.7
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Prestressed Concrete
Number of Spans
1
Structure Length
20.5 m (67 ft)
Deck Width
11.8 m (39 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
242 vehicles/day
Structure Number
049084F

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether OREM CITY ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OREM CITY ROAD against other structures in Utah and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OREM CITY ROAD?

OREM CITY ROAD in Utah, Utah has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is OREM CITY ROAD inspected?

OREM CITY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 242 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OREM CITY ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OREM CITY ROAD?

OREM CITY ROAD has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining OREM CITY ROAD?

OREM CITY ROAD is owned and maintained by City/Municipal Highway Agency.

How old is OREM CITY ROAD and does age affect safety?

OREM CITY ROAD was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.