ALBEE CK CAMP

Carrying ALBEE CK CAMP over ALBEE CREEK

HUMBOLDT REDWOOD ST. PK., Humboldt, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
24 t Inventory load rating

Bridge Snapshot: ALBEE CK CAMP

The ALBEE CK CAMP bridge in Humboldt, California carries ALBEE CK CAMP over ALBEE CREEK. It was built in 1986, making it 40 years old today. The structure is built primarily of steel and spans 1 section, stretching 10.7 meters (35 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by State Park/Forest/Reservation.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 23.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ALBEE CK CAMP compares

▼ 7.6
Load rating vs California average (31.3 t)
Bottom 18%
Lower load rating than 82% of California bridges
398
Bridges in Humboldt · 25 in Poor condition
ALBEE CK CAMP 23.7 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
47.4 / 100 - historical 20–49.9 band
Structural adequacy /55
21.6
Serviceability /30
11.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
23.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1986
Material
Steel
Number of Spans
1
Structure Length
10.7 m (35 ft)
Deck Width
4.0 m (13 ft)
Owner
State Park/Forest/Reservation
Avg Daily Traffic
10 vehicles/day
Structure Number
04P0011

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

ALBEE CK CAMP is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare ALBEE CK CAMP against other structures in Humboldt and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ALBEE CK CAMP?

ALBEE CK CAMP in Humboldt, California has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ALBEE CK CAMP inspected?

ALBEE CK CAMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ALBEE CK CAMP is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ALBEE CK CAMP?

ALBEE CK CAMP has an NBI inventory load rating of 23.7 metric tons.

Who is responsible for maintaining ALBEE CK CAMP?

ALBEE CK CAMP is owned and maintained by State Park/Forest/Reservation.

How old is ALBEE CK CAMP and does age affect safety?

ALBEE CK CAMP was built in 1986, making it 40 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.