FHWA NBI 2024 Inspection record Public-domain dataset

ROAD M10

Carrying ROAD M10 over BEAR CREEK

24 MI. N.E. OF UPPERLAKE, Lake, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: ROAD M10

The ROAD M10 bridge in Lake, California carries ROAD M10 over BEAR CREEK. It was built in 1973, making it 53 years old today. The structure is built primarily of concrete and spans 1 section, stretching 16.3 meters (53 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 30.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROAD M10 compares

▼ 1.2
Load rating vs California average (31.3 t)
Bottom 37%
Lower load rating than 63% of California bridges
129
Bridges in Lake · 10 in Poor condition
ROAD M10 30.1 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
83.9 / 100 - historical 80–100 band
Structural adequacy /55
53.9
Serviceability /30
15.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1973
Material
Concrete
Number of Spans
1
Structure Length
16.3 m (53 ft)
Deck Width
4.8 m (16 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
20 vehicles/day
Structure Number
050854000001008

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether ROAD M10 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROAD M10 against other structures in Lake and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROAD M10?

ROAD M10 in Lake, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ROAD M10 inspected?

ROAD M10's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROAD M10 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROAD M10?

ROAD M10 has an NBI inventory load rating of 30.1 metric tons.

Who is responsible for maintaining ROAD M10?

ROAD M10 is owned and maintained by U.S. Forest Service.

How old is ROAD M10 and does age affect safety?

ROAD M10 was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.