FHWA NBI 2024 Inspection record Public-domain dataset

CORYDON GREENLICK

Carrying CORYDON GREENLICK over BRANCH--ROCK CREEK

2.1 MI. W. US 60, Henderson, Kentucky

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
38 t Inventory load rating

Bridge Snapshot: CORYDON GREENLICK

The CORYDON GREENLICK bridge in Henderson, Kentucky carries CORYDON GREENLICK over BRANCH--ROCK CREEK. It was built in 1985, making it 41 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.7 meters (45 feet) end to end. Daily traffic averages 133 vehicles, placing it in the lower-traffic tier of Kentucky bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 37.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CORYDON GREENLICK compares

▼ 1.4
Load rating vs Kentucky average (39.2 t)
Bottom 44%
Lower load rating than 56% of Kentucky bridges
186
Bridges in Henderson · 9 in Poor condition
CORYDON GREENLICK 37.8 t
Kentucky average 39.2 t

Live comparison across Kentucky.

Historical Sufficiency Rating

PlainBridge-computed
87.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
20.5
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
37.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.7 m (45 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
133 vehicles/day
Structure Number
051C00080N

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether CORYDON GREENLICK is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CORYDON GREENLICK against other structures in Henderson and across Kentucky. Kentucky bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CORYDON GREENLICK?

CORYDON GREENLICK in Henderson, Kentucky has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CORYDON GREENLICK inspected?

CORYDON GREENLICK's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 133 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CORYDON GREENLICK is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CORYDON GREENLICK?

CORYDON GREENLICK has an NBI inventory load rating of 37.8 metric tons.

Who is responsible for maintaining CORYDON GREENLICK?

CORYDON GREENLICK is owned and maintained by County Highway Agency.

How old is CORYDON GREENLICK and does age affect safety?

CORYDON GREENLICK was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.