FHWA NBI 2024 Inspection record Public-domain dataset

RAY RD

Carrying RAY RD over BOOKER BRANCH

1 MI NW CADEVILLE, Ouachita, Louisiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
21 t Inventory load rating

Bridge Snapshot: RAY RD

The RAY RD bridge in Ouachita, Louisiana carries RAY RD over BOOKER BRANCH. It was built in 1965, making it 61 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 35 vehicles, placing it in the lower-traffic tier of Louisiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 20.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RAY RD compares

▼ 11.4
Load rating vs Louisiana average (32.3 t)
Bottom 19%
Lower load rating than 81% of Louisiana bridges
337
Bridges in Ouachita · 36 in Poor condition
RAY RD 20.9 t
Louisiana average 32.3 t

Live comparison across Louisiana.

Historical Sufficiency Rating

PlainBridge-computed
54.3 / 100 - historical 50–79.9 band
Structural adequacy /55
17.3
Serviceability /30
25.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
20.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Wood or Timber
Number of Spans
3
Structure Length
13.4 m (44 ft)
Deck Width
6.1 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
35 vehicles/day
Structure Number
053732261922111

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

RAY RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare RAY RD against other structures in Ouachita and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAY RD?

RAY RD in Ouachita, Louisiana has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is RAY RD inspected?

RAY RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAY RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAY RD?

RAY RD has an NBI inventory load rating of 20.9 metric tons.

Who is responsible for maintaining RAY RD?

RAY RD is owned and maintained by County Highway Agency.

How old is RAY RD and does age affect safety?

RAY RD was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.