N SEMINARY /FAU 89
Carrying N SEMINARY /FAU 89 over BLACK CREEK
0.25 N BELTLINE, Madison, Illinois
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: N SEMINARY /FAU 89
The N SEMINARY /FAU 89 bridge in Madison, Illinois carries N SEMINARY /FAU 89 over BLACK CREEK. It was built in 1966, making it 60 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of concrete and spans 3 sections, stretching 23.6 meters (77 feet) end to end. Daily traffic averages 4,600 vehicles, placing it in the moderately-trafficked tier of Illinois bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 30.8 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How N SEMINARY /FAU 89 compares
Live comparison across Illinois.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1966
- Last Reconstructed
- 1991
- Material
- Concrete
- Number of Spans
- 3
- Structure Length
- 23.6 m (77 ft)
- Deck Width
- 11.9 m (39 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 4,600 vehicles/day
- Structure Number
- 060610200000000
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
- • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
- • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
How to read this record
N SEMINARY /FAU 89 is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare N SEMINARY /FAU 89 against other structures in Madison and across Illinois. Illinois bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for N SEMINARY /FAU 89?
N SEMINARY /FAU 89 in Madison, Illinois has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.
How often is N SEMINARY /FAU 89 inspected?
N SEMINARY /FAU 89's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,600 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. N SEMINARY /FAU 89 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for N SEMINARY /FAU 89?
N SEMINARY /FAU 89 has an NBI inventory load rating of 30.8 metric tons.
Who is responsible for maintaining N SEMINARY /FAU 89?
N SEMINARY /FAU 89 is owned and maintained by City/Municipal Highway Agency.
How old is N SEMINARY /FAU 89 and does age affect safety?
N SEMINARY /FAU 89 was built in 1966, making it 60 years old and last reconstructed in 1991.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.