FHWA NBI 2024 Inspection record Public-domain dataset

ROAD

Carrying ROAD over LAKE CREEK

NO DATA ENTERED, Chelan, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
24 t Inventory load rating

Bridge Snapshot: ROAD

The ROAD bridge in Chelan, Washington carries ROAD over LAKE CREEK. It was built in 1960, making it 66 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 23.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROAD compares

▼ 9.9
Load rating vs Washington average (33.5 t)
Bottom 28%
Lower load rating than 72% of Washington bridges
154
Bridges in Chelan · 12 in Poor condition
ROAD 23.6 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
69.1 / 100 - historical 50–79.9 band
Structural adequacy /55
46.5
Serviceability /30
15.0
Essentiality /15
14.5
Special reductions
−6.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
23.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Material
Concrete Continuous
Number of Spans
3
Structure Length
30.5 m (100 ft)
Deck Width
4.8 m (16 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
061706000001437

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROAD against other structures in Chelan and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROAD?

ROAD in Chelan, Washington has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ROAD inspected?

ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROAD?

ROAD has an NBI inventory load rating of 23.6 metric tons.

Who is responsible for maintaining ROAD?

ROAD is owned and maintained by U.S. Forest Service.

How old is ROAD and does age affect safety?

ROAD was built in 1960, making it 66 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.