FHWA NBI 2024 Inspection record Public-domain dataset

DOWNSTREAM ROAD

Carrying DOWNSTREAM ROAD over NORTH FORK TIETON

W. OF CLEAR LAKE, Yakima, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: DOWNSTREAM ROAD

The DOWNSTREAM ROAD bridge in Yakima, Washington carries DOWNSTREAM ROAD over NORTH FORK TIETON. It was built in 1971, making it 55 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 40.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How DOWNSTREAM ROAD compares

▲ 7.4
Load rating vs Washington average (33.5 t)
Top 23%
Higher load rating than 77% of Washington bridges
565
Bridges in Yakima · 26 in Poor condition
DOWNSTREAM ROAD 40.9 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
79.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
15.0
Essentiality /15
14.9
Special reductions
−5.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Concrete Continuous
Number of Spans
3
Structure Length
30.5 m (100 ft)
Deck Width
4.9 m (16 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
10 vehicles/day
Structure Number
061708000001511

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether DOWNSTREAM ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare DOWNSTREAM ROAD against other structures in Yakima and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for DOWNSTREAM ROAD?

DOWNSTREAM ROAD in Yakima, Washington has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is DOWNSTREAM ROAD inspected?

DOWNSTREAM ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. DOWNSTREAM ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for DOWNSTREAM ROAD?

DOWNSTREAM ROAD has an NBI inventory load rating of 40.9 metric tons.

Who is responsible for maintaining DOWNSTREAM ROAD?

DOWNSTREAM ROAD is owned and maintained by U.S. Forest Service.

How old is DOWNSTREAM ROAD and does age affect safety?

DOWNSTREAM ROAD was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.