HOLLY LN
Carrying HOLLY LN over ABERNETHY CREEK
150 FT S OF REDLAND, Clackamas, Oregon
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: HOLLY LN
The HOLLY LN bridge in Clackamas, Oregon carries HOLLY LN over ABERNETHY CREEK. It was built in 1933, making it 93 years old today. It was last reconstructed in 1967, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 31.7 meters (104 feet) end to end. Daily traffic averages 9,700 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 9.1 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How HOLLY LN compares
Live comparison across Oregon.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1933
- Last Reconstructed
- 1967
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 31.7 m (104 ft)
- Deck Width
- 7.7 m (25 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 9,700 vehicles/day
- Structure Number
- 06217 060 00184
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
- • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
- • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.
How to read this record
HOLLY LN is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare HOLLY LN against other structures in Clackamas and across Oregon. Oregon bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for HOLLY LN?
HOLLY LN in Clackamas, Oregon has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is HOLLY LN inspected?
HOLLY LN's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,700 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. HOLLY LN is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for HOLLY LN?
HOLLY LN has an NBI inventory load rating of 9.1 metric tons.
Who is responsible for maintaining HOLLY LN?
HOLLY LN is owned and maintained by County Highway Agency.
How old is HOLLY LN and does age affect safety?
HOLLY LN was built in 1933, making it 93 years old and last reconstructed in 1967.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.