FHWA NBI 2024 Inspection record Public-domain dataset

NEW BREMEN-N.K. RD

Carrying NEW BREMEN-N.K. RD over WIERTH DITCH

1.0 MI. N. OF NEW BREMEN, Auglaize, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
56 t Inventory load rating

Bridge Snapshot: NEW BREMEN-N.K. RD

The NEW BREMEN-N.K. RD bridge in Auglaize, Ohio carries NEW BREMEN-N.K. RD over WIERTH DITCH. It was built in 1946, making it 80 years old today. It was last reconstructed in 2009, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 676 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 56.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NEW BREMEN-N.K. RD compares

▲ 18.9
Load rating vs Ohio average (37.5 t)
Top 9%
Higher load rating than 91% of Ohio bridges
321
Bridges in Auglaize · 1 in Poor condition
NEW BREMEN-N.K. RD 56.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
93.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
26.5
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
56.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1946
Last Reconstructed
2009
Material
Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
8.8 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
676 vehicles/day
Structure Number
0631868

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether NEW BREMEN-N.K. RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NEW BREMEN-N.K. RD against other structures in Auglaize and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW BREMEN-N.K. RD?

NEW BREMEN-N.K. RD in Auglaize, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is NEW BREMEN-N.K. RD inspected?

NEW BREMEN-N.K. RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 676 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW BREMEN-N.K. RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW BREMEN-N.K. RD?

NEW BREMEN-N.K. RD has an NBI inventory load rating of 56.4 metric tons.

Who is responsible for maintaining NEW BREMEN-N.K. RD?

NEW BREMEN-N.K. RD is owned and maintained by County Highway Agency.

How old is NEW BREMEN-N.K. RD and does age affect safety?

NEW BREMEN-N.K. RD was built in 1946, making it 80 years old and last reconstructed in 2009.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.