FHWA NBI 2024 Inspection record Public-domain dataset

CH 1(FAS 658)

Carrying CH 1(FAS 658) over WEST OKAW RIVER

2.5 MI N LOVINGTON, Moultrie, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating

Bridge Snapshot: CH 1(FAS 658)

The CH 1(FAS 658) bridge in Moultrie, Illinois carries CH 1(FAS 658) over WEST OKAW RIVER. It was built in 1973, making it 53 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 46.4 meters (152 feet) end to end. Daily traffic averages 350 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 29.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CH 1(FAS 658) compares

▼ 4.8
Load rating vs Illinois average (34.6 t)
Bottom 20%
Lower load rating than 80% of Illinois bridges
171
Bridges in Moultrie · 17 in Poor condition
CH 1(FAS 658) 29.8 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
77.2 / 100 - historical 50–79.9 band
Structural adequacy /55
43.6
Serviceability /30
18.7
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
29.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1973
Material
Prestressed Concrete
Number of Spans
3
Structure Length
46.4 m (152 ft)
Deck Width
9.2 m (30 ft)
Owner
County Highway Agency
Avg Daily Traffic
350 vehicles/day
Structure Number
070300300000000

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether CH 1(FAS 658) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CH 1(FAS 658) against other structures in Moultrie and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CH 1(FAS 658)?

CH 1(FAS 658) in Moultrie, Illinois has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is CH 1(FAS 658) inspected?

CH 1(FAS 658)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 350 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CH 1(FAS 658) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CH 1(FAS 658)?

CH 1(FAS 658) has an NBI inventory load rating of 29.8 metric tons.

Who is responsible for maintaining CH 1(FAS 658)?

CH 1(FAS 658) is owned and maintained by County Highway Agency.

How old is CH 1(FAS 658) and does age affect safety?

CH 1(FAS 658) was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.