FHWA NBI 2024 Inspection record Public-domain dataset

EB I-474

Carrying EB I-474 over BNSF RR - KICKAPOO CR

S1/2 SEC 26 KICKAPOO, Peoria, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating

Bridge Snapshot: EB I-474

The EB I-474 bridge in Peoria, Illinois carries EB I-474 over BNSF RR - KICKAPOO CR. It was built in 1978, making it 48 years old today. The structure is built primarily of steel continuous and spans 8 sections, stretching 224.3 meters (736 feet) end to end. Daily traffic averages 13,000 vehicles, placing it in the heavily-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How EB I-474 compares

▼ 2.2
Load rating vs Illinois average (34.6 t)
Bottom 23%
Lower load rating than 77% of Illinois bridges
365
Bridges in Peoria · 49 in Poor condition
EB I-474 32.4 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
59.9 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
19.0
Essentiality /15
10.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Steel Continuous
Number of Spans
8
Structure Length
224.3 m (736 ft)
Deck Width
16.5 m (54 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,000 vehicles/day
Structure Number
072011400000000

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

EB I-474 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare EB I-474 against other structures in Peoria and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for EB I-474?

EB I-474 in Peoria, Illinois has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is EB I-474 inspected?

EB I-474's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. EB I-474 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for EB I-474?

EB I-474 has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining EB I-474?

EB I-474 is owned and maintained by State Highway Agency.

How old is EB I-474 and does age affect safety?

EB I-474 was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.