FHWA NBI 2024 Inspection record Public-domain dataset

PFEIFFER RD-TR 25

Carrying PFEIFFER RD-TR 25 over BR LA MARSH CREEK

NC1NENE114 33 T8NR7E, Peoria, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
16 t Inventory load rating

Bridge Snapshot: PFEIFFER RD-TR 25

The PFEIFFER RD-TR 25 bridge in Peoria, Illinois carries PFEIFFER RD-TR 25 over BR LA MARSH CREEK. It was built in 1980, making it 46 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 35.7 meters (117 feet) end to end. Daily traffic averages 950 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 16.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PFEIFFER RD-TR 25 compares

▼ 18.4
Load rating vs Illinois average (34.6 t)
Bottom 2%
Lower load rating than 98% of Illinois bridges
365
Bridges in Peoria · 49 in Poor condition
PFEIFFER RD-TR 25 16.2 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
39.4 / 100 - historical 20–49.9 band
Structural adequacy /55
8.8
Serviceability /30
15.9
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
16.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Material
Prestressed Concrete
Number of Spans
3
Structure Length
35.7 m (117 ft)
Deck Width
9.3 m (31 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
950 vehicles/day
Structure Number
072550700000000

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

PFEIFFER RD-TR 25 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PFEIFFER RD-TR 25 against other structures in Peoria and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PFEIFFER RD-TR 25?

PFEIFFER RD-TR 25 in Peoria, Illinois has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PFEIFFER RD-TR 25 inspected?

PFEIFFER RD-TR 25's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 950 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PFEIFFER RD-TR 25 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PFEIFFER RD-TR 25?

PFEIFFER RD-TR 25 has an NBI inventory load rating of 16.2 metric tons.

Who is responsible for maintaining PFEIFFER RD-TR 25?

PFEIFFER RD-TR 25 is owned and maintained by Town/Township Highway Agency.

How old is PFEIFFER RD-TR 25 and does age affect safety?

PFEIFFER RD-TR 25 was built in 1980, making it 46 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.