FHWA NBI 2024 Inspection record Public-domain dataset

TR 0325

Carrying TR 0325 over DUTCH CREEK

1.5 MI NW SUMMER HIL, Pike, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
12 t Inventory load rating

Bridge Snapshot: TR 0325

The TR 0325 bridge in Pike, Illinois carries TR 0325 over DUTCH CREEK. It was built in 1962, making it 64 years old today. The structure is built primarily of steel and spans 1 section, stretching 25.3 meters (83 feet) end to end. Daily traffic averages 25 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 3/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 12.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TR 0325 compares

▼ 22.6
Load rating vs Illinois average (34.6 t)
Bottom 1%
Lower load rating than 99% of Illinois bridges
338
Bridges in Pike · 33 in Poor condition
TR 0325 12.0 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
37.0 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
22.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
3/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
12.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1962
Material
Steel
Number of Spans
1
Structure Length
25.3 m (83 ft)
Deck Width
6.3 m (21 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
25 vehicles/day
Structure Number
075322000000000

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 3/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

TR 0325 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TR 0325 against other structures in Pike and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 0325?

TR 0325 in Pike, Illinois has a deck rating of 6/9, superstructure rating of 3/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is TR 0325 inspected?

TR 0325's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 25 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 0325 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 0325?

TR 0325 has an NBI inventory load rating of 12.0 metric tons.

Who is responsible for maintaining TR 0325?

TR 0325 is owned and maintained by Town/Township Highway Agency.

How old is TR 0325 and does age affect safety?

TR 0325 was built in 1962, making it 64 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.