FHWA NBI 2024 Inspection record Public-domain dataset

IL 146

Carrying IL 146 over FLAT LICK BRANCH

4.2 M E IL 145, Pope, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
38 t Inventory load rating

Bridge Snapshot: IL 146

The IL 146 bridge in Pope, Illinois carries IL 146 over FLAT LICK BRANCH. It was built in 2014, making it 12 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 30.8 meters (101 feet) end to end. Daily traffic averages 1,250 vehicles, placing it in the moderately-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 37.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IL 146 compares

▲ 3.3
Load rating vs Illinois average (34.6 t)
Top 23%
Higher load rating than 77% of Illinois bridges
86
Bridges in Pope · 6 in Poor condition
IL 146 37.9 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
94.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
10.3
Special reductions
−0.3

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
37.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2014
Material
Concrete Continuous
Number of Spans
3
Structure Length
30.8 m (101 ft)
Deck Width
10.7 m (35 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,250 vehicles/day
Structure Number
076003200000000

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether IL 146 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IL 146 against other structures in Pope and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IL 146?

IL 146 in Pope, Illinois has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is IL 146 inspected?

IL 146's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,250 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IL 146 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IL 146?

IL 146 has an NBI inventory load rating of 37.9 metric tons.

Who is responsible for maintaining IL 146?

IL 146 is owned and maintained by State Highway Agency.

How old is IL 146 and does age affect safety?

IL 146 was built in 2014, making it 12 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.