FHWA NBI 2024 Inspection record Public-domain dataset

MARINE HWY ROUTE

Carrying MARINE HWY ROUTE over SKAGWAY FERRY TERMINAL

SKAGWAY, Skagway, Alaska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: MARINE HWY ROUTE

The MARINE HWY ROUTE bridge in Skagway, Alaska carries MARINE HWY ROUTE over SKAGWAY FERRY TERMINAL. It was built in 1980, making it 46 years old today. It was last reconstructed in 1994, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 53.3 meters (175 feet) end to end. Daily traffic averages 947 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 25.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MARINE HWY ROUTE compares

▼ 9.7
Load rating vs Alaska average (34.8 t)
Bottom 31%
Lower load rating than 69% of Alaska bridges
3
Bridges in Skagway · 1 in Poor condition
MARINE HWY ROUTE 25.1 t
Alaska average 34.8 t

Live comparison across Alaska.

Historical Sufficiency Rating

PlainBridge-computed
37.8 / 100 - historical 20–49.9 band
Structural adequacy /55
23.6
Serviceability /30
14.3
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
25.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Last Reconstructed
1994
Material
Steel
Number of Spans
1
Structure Length
53.3 m (175 ft)
Deck Width
5.2 m (17 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
947 vehicles/day
Structure Number
0805

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

MARINE HWY ROUTE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MARINE HWY ROUTE against other structures in Skagway and across Alaska. Alaska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MARINE HWY ROUTE?

MARINE HWY ROUTE in Skagway, Alaska has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is MARINE HWY ROUTE inspected?

MARINE HWY ROUTE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 947 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MARINE HWY ROUTE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MARINE HWY ROUTE?

MARINE HWY ROUTE has an NBI inventory load rating of 25.1 metric tons.

Who is responsible for maintaining MARINE HWY ROUTE?

MARINE HWY ROUTE is owned and maintained by City/Municipal Highway Agency.

How old is MARINE HWY ROUTE and does age affect safety?

MARINE HWY ROUTE was built in 1980, making it 46 years old and last reconstructed in 1994.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.