FHWA NBI 2024 Inspection record Public-domain dataset

FDR 145-A

Carrying FDR 145-A over DRY PRONG CREEK

NO DATA ENTERED, Grant, Louisiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
18 t Inventory load rating

Bridge Snapshot: FDR 145-A

The FDR 145-A bridge in Grant, Louisiana carries FDR 145-A over DRY PRONG CREEK. It was built in 1970, making it 56 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 18.3 meters (60 feet) end to end. Daily traffic averages 13 vehicles, placing it in the lower-traffic tier of Louisiana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 18.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FDR 145-A compares

▼ 14.2
Load rating vs Louisiana average (32.3 t)
Bottom 12%
Lower load rating than 88% of Louisiana bridges
209
Bridges in Grant · 32 in Poor condition
FDR 145-A 18.1 t
Louisiana average 32.3 t

Live comparison across Louisiana.

Historical Sufficiency Rating

PlainBridge-computed
51.4 / 100 - historical 50–79.9 band
Structural adequacy /55
12.4
Serviceability /30
27.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
18.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Prestressed Concrete
Number of Spans
3
Structure Length
18.3 m (60 ft)
Deck Width
7.6 m (25 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
13 vehicles/day
Structure Number
080601000002153

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

FDR 145-A is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FDR 145-A against other structures in Grant and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FDR 145-A?

FDR 145-A in Grant, Louisiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is FDR 145-A inspected?

FDR 145-A's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FDR 145-A is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FDR 145-A?

FDR 145-A has an NBI inventory load rating of 18.1 metric tons.

Who is responsible for maintaining FDR 145-A?

FDR 145-A is owned and maintained by U.S. Forest Service.

How old is FDR 145-A and does age affect safety?

FDR 145-A was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.