FHWA NBI 2024 Inspection record Public-domain dataset

FH 59

Carrying FH 59 over DOUBLE BRANCH

NO DATA ENTERED, Natchitoches, Louisiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: FH 59

The FH 59 bridge in Natchitoches, Louisiana carries FH 59 over DOUBLE BRANCH. It was built in 1969, making it 57 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 14.0 meters (46 feet) end to end. Daily traffic averages 80 vehicles, placing it in the lower-traffic tier of Louisiana bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 18.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FH 59 compares

▼ 13.8
Load rating vs Louisiana average (32.3 t)
Bottom 13%
Lower load rating than 87% of Louisiana bridges
313
Bridges in Natchitoches · 48 in Poor condition
FH 59 18.5 t
Louisiana average 32.3 t

Live comparison across Louisiana.

Historical Sufficiency Rating

PlainBridge-computed
47.0 / 100 - historical 20–49.9 band
Structural adequacy /55
13.1
Serviceability /30
22.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
18.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1969
Material
Prestressed Concrete
Number of Spans
3
Structure Length
14.0 m (46 ft)
Deck Width
7.6 m (25 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
80 vehicles/day
Structure Number
080603000002331

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

FH 59 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FH 59 against other structures in Natchitoches and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FH 59?

FH 59 in Natchitoches, Louisiana has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is FH 59 inspected?

FH 59's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 80 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FH 59 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FH 59?

FH 59 has an NBI inventory load rating of 18.5 metric tons.

Who is responsible for maintaining FH 59?

FH 59 is owned and maintained by U.S. Forest Service.

How old is FH 59 and does age affect safety?

FH 59 was built in 1969, making it 57 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.