FHWA NBI 2024 Inspection record Public-domain dataset

Purdy Lane

Carrying Purdy Lane over Green Bush Draw

2.5 mi E Jct Naco Hwy, Cochise, Arizona

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
22 t Inventory load rating

Bridge Snapshot: Purdy Lane

The Purdy Lane bridge in Cochise, Arizona carries Purdy Lane over Green Bush Draw. It was built in 1938, making it 88 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Arizona bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 21.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Purdy Lane compares

▼ 25.6
Load rating vs Arizona average (47.4 t)
Bottom 4%
Lower load rating than 96% of Arizona bridges
215
Bridges in Cochise · 7 in Poor condition
Purdy Lane 21.8 t
Arizona average 47.4 t

Live comparison across Arizona.

Historical Sufficiency Rating

PlainBridge-computed
59.5 / 100 - historical 50–79.9 band
Structural adequacy /55
33.8
Serviceability /30
11.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
21.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1938
Material
Concrete Continuous
Number of Spans
3
Structure Length
13.4 m (44 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
500 vehicles/day
Structure Number
08118

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether Purdy Lane is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Purdy Lane against other structures in Cochise and across Arizona. Arizona bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Purdy Lane?

Purdy Lane in Cochise, Arizona has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is Purdy Lane inspected?

Purdy Lane's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Purdy Lane is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Purdy Lane?

Purdy Lane has an NBI inventory load rating of 21.8 metric tons.

Who is responsible for maintaining Purdy Lane?

Purdy Lane is owned and maintained by County Highway Agency.

How old is Purdy Lane and does age affect safety?

Purdy Lane was built in 1938, making it 88 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.