FHWA NBI 2024 Inspection record Public-domain dataset

NORTH MILITARY RD.

Carrying NORTH MILITARY RD. over OLEQUA CREEK

4.55 N JCT SR 505, Lewis, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
35 t Inventory load rating

Bridge Snapshot: NORTH MILITARY RD.

The NORTH MILITARY RD. bridge in Lewis, Washington carries NORTH MILITARY RD. over OLEQUA CREEK. It was built in 1995, making it 31 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 2,252 vehicles, placing it in the moderately-trafficked tier of Washington bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 34.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NORTH MILITARY RD. compares

▲ 1.0
Load rating vs Washington average (33.5 t)
Top 38%
Higher load rating than 62% of Washington bridges
422
Bridges in Lewis · 14 in Poor condition
NORTH MILITARY RD. 34.5 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
97.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
34.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1995
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
11.3 m (37 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,252 vehicles/day
Structure Number
081313000000000

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether NORTH MILITARY RD. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NORTH MILITARY RD. against other structures in Lewis and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NORTH MILITARY RD.?

NORTH MILITARY RD. in Lewis, Washington has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is NORTH MILITARY RD. inspected?

NORTH MILITARY RD.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,252 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NORTH MILITARY RD. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NORTH MILITARY RD.?

NORTH MILITARY RD. has an NBI inventory load rating of 34.5 metric tons.

Who is responsible for maintaining NORTH MILITARY RD.?

NORTH MILITARY RD. is owned and maintained by County Highway Agency.

How old is NORTH MILITARY RD. and does age affect safety?

NORTH MILITARY RD. was built in 1995, making it 31 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.