FHWA NBI 2024 Inspection record Public-domain dataset

TUALCO LOOP RD

Carrying TUALCO LOOP RD over RILEY SLOUGH

1.0 NW JCT SR 203, Snohomish, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
35 t Inventory load rating

Bridge Snapshot: TUALCO LOOP RD

The TUALCO LOOP RD bridge in Snohomish, Washington carries TUALCO LOOP RD over RILEY SLOUGH. It was built in 1970, making it 56 years old today. It was last reconstructed in 1989, extending its service life. The structure is built primarily of wood or timber and spans 4 sections, stretching 23.2 meters (76 feet) end to end. Daily traffic averages 200 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 34.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TUALCO LOOP RD compares

▲ 1.0
Load rating vs Washington average (33.5 t)
Top 38%
Higher load rating than 62% of Washington bridges
516
Bridges in Snohomish · 19 in Poor condition
TUALCO LOOP RD 34.5 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
51.9 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
8.0
Essentiality /15
14.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
34.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Last Reconstructed
1989
Material
Wood or Timber
Number of Spans
4
Structure Length
23.2 m (76 ft)
Deck Width
5.7 m (19 ft)
Owner
County Highway Agency
Avg Daily Traffic
200 vehicles/day
Structure Number
081529000000000

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

TUALCO LOOP RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TUALCO LOOP RD against other structures in Snohomish and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TUALCO LOOP RD?

TUALCO LOOP RD in Snohomish, Washington has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is TUALCO LOOP RD inspected?

TUALCO LOOP RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TUALCO LOOP RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TUALCO LOOP RD?

TUALCO LOOP RD has an NBI inventory load rating of 34.5 metric tons.

Who is responsible for maintaining TUALCO LOOP RD?

TUALCO LOOP RD is owned and maintained by County Highway Agency.

How old is TUALCO LOOP RD and does age affect safety?

TUALCO LOOP RD was built in 1970, making it 56 years old and last reconstructed in 1989.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.