FHWA NBI 2024 Inspection record Public-domain dataset

PRECOURT ST

Carrying PRECOURT ST over B & M RR

0.4 MI SEOF ROUTE 111, York, Maine

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: PRECOURT ST

The PRECOURT ST bridge in York, Maine carries PRECOURT ST over B & M RR. It was built in 1989, making it 37 years old today. The structure is built primarily of steel continuous and spans 5 sections, stretching 132.9 meters (436 feet) end to end. Daily traffic averages 15,900 vehicles, placing it in the heavily-trafficked tier of Maine bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PRECOURT ST compares

▼ 14.3
Load rating vs Maine average (40.2 t)
Bottom 15%
Lower load rating than 85% of Maine bridges
30
Bridges in York · 1 in Poor condition
PRECOURT ST 25.9 t
Maine average 40.2 t

Live comparison across Maine.

Historical Sufficiency Rating

PlainBridge-computed
89.2 / 100 - historical 80–100 band
Structural adequacy /55
49.6
Serviceability /30
30.0
Essentiality /15
12.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1989
Material
Steel Continuous
Number of Spans
5
Structure Length
132.9 m (436 ft)
Deck Width
15.8 m (52 ft)
Owner
State Highway Agency
Avg Daily Traffic
15,900 vehicles/day
Structure Number
0822

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PRECOURT ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PRECOURT ST against other structures in York and across Maine. Maine bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PRECOURT ST?

PRECOURT ST in York, Maine has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PRECOURT ST inspected?

PRECOURT ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15,900 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PRECOURT ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PRECOURT ST?

PRECOURT ST has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining PRECOURT ST?

PRECOURT ST is owned and maintained by State Highway Agency.

How old is PRECOURT ST and does age affect safety?

PRECOURT ST was built in 1989, making it 37 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.