FHWA NBI 2024 Inspection record Public-domain dataset

MINERAL CREEK ROAD

Carrying MINERAL CREEK ROAD over MINERAL CREEK

1.8 E MINERAL, Lewis, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
67 t Inventory load rating

Bridge Snapshot: MINERAL CREEK ROAD

The MINERAL CREEK ROAD bridge in Lewis, Washington carries MINERAL CREEK ROAD over MINERAL CREEK. It was built in 2005, making it 21 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 61.0 meters (200 feet) end to end. Daily traffic averages 168 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 67.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MINERAL CREEK ROAD compares

▲ 33.6
Load rating vs Washington average (33.5 t)
Top 4%
Higher load rating than 96% of Washington bridges
422
Bridges in Lewis · 14 in Poor condition
MINERAL CREEK ROAD 67.1 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
93.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.7
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
67.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2005
Material
Prestressed Concrete
Number of Spans
1
Structure Length
61.0 m (200 ft)
Deck Width
9.3 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
168 vehicles/day
Structure Number
087327000000000

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether MINERAL CREEK ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MINERAL CREEK ROAD against other structures in Lewis and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MINERAL CREEK ROAD?

MINERAL CREEK ROAD in Lewis, Washington has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is MINERAL CREEK ROAD inspected?

MINERAL CREEK ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 168 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MINERAL CREEK ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MINERAL CREEK ROAD?

MINERAL CREEK ROAD has an NBI inventory load rating of 67.1 metric tons.

Who is responsible for maintaining MINERAL CREEK ROAD?

MINERAL CREEK ROAD is owned and maintained by County Highway Agency.

How old is MINERAL CREEK ROAD and does age affect safety?

MINERAL CREEK ROAD was built in 2005, making it 21 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.