FHWA NBI 2024 Inspection record Public-domain dataset

WEST BABLER ROAD

Carrying WEST BABLER ROAD over BRUSH CREEK

2.0 MI SE ORANGEVILL, Stephenson, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good

Bridge Snapshot: WEST BABLER ROAD

The WEST BABLER ROAD bridge in Stephenson, Illinois carries WEST BABLER ROAD over BRUSH CREEK. It was built in 1957, making it 69 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.7 meters (45 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WEST BABLER ROAD compares

332
Bridges in Stephenson · 9 in Poor condition

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
40.0 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
25.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1957
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.7 m (45 ft)
Deck Width
7.3 m (24 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
089308700000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether WEST BABLER ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WEST BABLER ROAD against other structures in Stephenson and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WEST BABLER ROAD?

WEST BABLER ROAD in Stephenson, Illinois has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is WEST BABLER ROAD inspected?

WEST BABLER ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WEST BABLER ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WEST BABLER ROAD?

An inventory load rating is not recorded for WEST BABLER ROAD.

Who is responsible for maintaining WEST BABLER ROAD?

WEST BABLER ROAD is owned and maintained by Town/Township Highway Agency.

How old is WEST BABLER ROAD and does age affect safety?

WEST BABLER ROAD was built in 1957, making it 69 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.