FHWA NBI 2024 Inspection record Public-domain dataset

GREENE DR

Carrying GREENE DR over CANEY CREEK

0.1 MI SOUTH KY 189, Muhlenberg, Kentucky

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating

Bridge Snapshot: GREENE DR

The GREENE DR bridge in Muhlenberg, Kentucky carries GREENE DR over CANEY CREEK. It was built in 1981, making it 45 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 46.6 meters (153 feet) end to end. Daily traffic averages 400 vehicles, placing it in the lower-traffic tier of Kentucky bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 16.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GREENE DR compares

▼ 22.8
Load rating vs Kentucky average (39.2 t)
Bottom 8%
Lower load rating than 92% of Kentucky bridges
153
Bridges in Muhlenberg · 7 in Poor condition
GREENE DR 16.4 t
Kentucky average 39.2 t

Live comparison across Kentucky.

Historical Sufficiency Rating

PlainBridge-computed
78.1 / 100 - historical 50–79.9 band
Structural adequacy /55
34.2
Serviceability /30
29.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
16.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Prestressed Concrete
Number of Spans
3
Structure Length
46.6 m (153 ft)
Deck Width
12.2 m (40 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
400 vehicles/day
Structure Number
089C00032N

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether GREENE DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GREENE DR against other structures in Muhlenberg and across Kentucky. Kentucky bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GREENE DR?

GREENE DR in Muhlenberg, Kentucky has a deck rating of 6/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is GREENE DR inspected?

GREENE DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GREENE DR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GREENE DR?

GREENE DR has an NBI inventory load rating of 16.4 metric tons.

Who is responsible for maintaining GREENE DR?

GREENE DR is owned and maintained by City/Municipal Highway Agency.

How old is GREENE DR and does age affect safety?

GREENE DR was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.