FHWA NBI 2024 Inspection record Public-domain dataset

FOREST ROAD 5250

Carrying FOREST ROAD 5250 over M BR ONTONAGON RIVER

6 MI N 5 MI E OF WATERSM, Ontonagon, Michigan

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
13 t Inventory load rating

Bridge Snapshot: FOREST ROAD 5250

The FOREST ROAD 5250 bridge in Ontonagon, Michigan carries FOREST ROAD 5250 over M BR ONTONAGON RIVER. It was built in 1954, making it 72 years old today. It was last reconstructed in 1993, extending its service life. The structure is built primarily of wood or timber and spans 2 sections, stretching 15.5 meters (51 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Michigan bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 13.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FOREST ROAD 5250 compares

▼ 28.7
Load rating vs Michigan average (41.7 t)
Bottom 4%
Lower load rating than 96% of Michigan bridges
5
Bridges in Ontonagon
FOREST ROAD 5250 13.0 t
Michigan average 41.7 t

Live comparison across Michigan.

Historical Sufficiency Rating

PlainBridge-computed
40.0 / 100 - historical 20–49.9 band
Structural adequacy /55
17.2
Serviceability /30
8.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
13.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1954
Last Reconstructed
1993
Material
Wood or Timber
Number of Spans
2
Structure Length
15.5 m (51 ft)
Deck Width
4.6 m (15 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
090706000001015

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether FOREST ROAD 5250 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FOREST ROAD 5250 against other structures in Ontonagon and across Michigan. Michigan bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FOREST ROAD 5250?

FOREST ROAD 5250 in Ontonagon, Michigan has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FOREST ROAD 5250 inspected?

FOREST ROAD 5250's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FOREST ROAD 5250 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FOREST ROAD 5250?

FOREST ROAD 5250 has an NBI inventory load rating of 13.0 metric tons.

Who is responsible for maintaining FOREST ROAD 5250?

FOREST ROAD 5250 is owned and maintained by U.S. Forest Service.

How old is FOREST ROAD 5250 and does age affect safety?

FOREST ROAD 5250 was built in 1954, making it 72 years old and last reconstructed in 1993.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.