HAM NEW LONDON RD
Carrying HAM NEW LONDON RD over TRIB. TO PADDY'S RUN
.1 MI N OF SR 126, Butler, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: HAM NEW LONDON RD
The HAM NEW LONDON RD bridge in Butler, Ohio carries HAM NEW LONDON RD over TRIB. TO PADDY'S RUN. It was built in 1986, making it 40 years old today. The structure is built primarily of concrete and spans 1 section, stretching 7.7 meters (25 feet) end to end. Daily traffic averages 351 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 28.2 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How HAM NEW LONDON RD compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1986
- Material
- Concrete
- Number of Spans
- 1
- Structure Length
- 7.7 m (25 ft)
- Deck Width
- 7.7 m (25 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 351 vehicles/day
- Structure Number
- 0931470
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
- • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
- • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.
How to read this record
This page shows what the last federal inspection recorded, not whether HAM NEW LONDON RD is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare HAM NEW LONDON RD against other structures in Butler and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for HAM NEW LONDON RD?
HAM NEW LONDON RD in Butler, Ohio has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is HAM NEW LONDON RD inspected?
HAM NEW LONDON RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 351 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. HAM NEW LONDON RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for HAM NEW LONDON RD?
HAM NEW LONDON RD has an NBI inventory load rating of 28.2 metric tons.
Who is responsible for maintaining HAM NEW LONDON RD?
HAM NEW LONDON RD is owned and maintained by County Highway Agency.
How old is HAM NEW LONDON RD and does age affect safety?
HAM NEW LONDON RD was built in 1986, making it 40 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.