FHWA NBI 2024 Inspection record Public-domain dataset

CH-21

Carrying CH-21 over OWENS CREEK

3 MI. NW GOLDEN GATE, Wayne, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: CH-21

The CH-21 bridge in Wayne, Illinois carries CH-21 over OWENS CREEK. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 18.8 meters (62 feet) end to end. Daily traffic averages 325 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 8/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 41.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CH-21 compares

▲ 7.2
Load rating vs Illinois average (34.6 t)
Top 16%
Higher load rating than 84% of Illinois bridges
264
Bridges in Wayne · 24 in Poor condition
CH-21 41.8 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
67.0 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
24.2
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
8/9
Good (7–9)
Inventory Load Rating
41.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Prestressed Concrete
Number of Spans
1
Structure Length
18.8 m (62 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
325 vehicles/day
Structure Number
096344100000000

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

CH-21 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CH-21 against other structures in Wayne and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CH-21?

CH-21 in Wayne, Illinois has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is CH-21 inspected?

CH-21's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 325 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CH-21 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CH-21?

CH-21 has an NBI inventory load rating of 41.8 metric tons.

Who is responsible for maintaining CH-21?

CH-21 is owned and maintained by County Highway Agency.

How old is CH-21 and does age affect safety?

CH-21 was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.