FHWA NBI 2024 Inspection record Public-domain dataset

TR-254

Carrying TR-254 over RANDOLPH DRAIN DITCH

1 MI NE CENTERVILLE, White, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
33 t Inventory load rating

Bridge Snapshot: TR-254

The TR-254 bridge in White, Illinois carries TR-254 over RANDOLPH DRAIN DITCH. It was built in 1981, making it 45 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 29.9 meters (98 feet) end to end. Daily traffic averages 25 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TR-254 compares

▼ 1.9
Load rating vs Illinois average (34.6 t)
Top 34%
Higher load rating than 66% of Illinois bridges
210
Bridges in White · 12 in Poor condition
TR-254 32.7 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
71.0 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
28.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Concrete
Number of Spans
3
Structure Length
29.9 m (98 ft)
Deck Width
8.0 m (26 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
25 vehicles/day
Structure Number
097316800000000

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

TR-254 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TR-254 against other structures in White and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR-254?

TR-254 in White, Illinois has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is TR-254 inspected?

TR-254's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 25 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR-254 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR-254?

TR-254 has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining TR-254?

TR-254 is owned and maintained by Town/Township Highway Agency.

How old is TR-254 and does age affect safety?

TR-254 was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.