JACKSON BRANCH DRI
Carrying JACKSON BRANCH DRI over JACKSON CR
0.2M S OF LARAWAY RD, Will, Illinois
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: JACKSON BRANCH DRI
The JACKSON BRANCH DRI bridge in Will, Illinois carries JACKSON BRANCH DRI over JACKSON CR. It was built in 1977, making it 49 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 6.9 meters (23 feet) end to end. Daily traffic averages 1,350 vehicles, placing it in the moderately-trafficked tier of Illinois bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 24.3 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How JACKSON BRANCH DRI compares
Live comparison across Illinois.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1977
- Material
- Concrete Continuous
- Number of Spans
- 2
- Structure Length
- 6.9 m (23 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 1,350 vehicles/day
- Structure Number
- 099670200000000
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether JACKSON BRANCH DRI is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare JACKSON BRANCH DRI against other structures in Will and across Illinois. Illinois bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for JACKSON BRANCH DRI?
JACKSON BRANCH DRI in Will, Illinois on the FHWA's 0–9 scale.
How often is JACKSON BRANCH DRI inspected?
JACKSON BRANCH DRI's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,350 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. JACKSON BRANCH DRI is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for JACKSON BRANCH DRI?
JACKSON BRANCH DRI has an NBI inventory load rating of 24.3 metric tons.
Who is responsible for maintaining JACKSON BRANCH DRI?
JACKSON BRANCH DRI is owned and maintained by City/Municipal Highway Agency.
How old is JACKSON BRANCH DRI and does age affect safety?
JACKSON BRANCH DRI was built in 1977, making it 49 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.