FHWA NBI 2024 Inspection record Public-domain dataset

SR-22

Carrying SR-22 over SEVIER IRRIGATION CANAL

1.5 MILES N. OF ANTIMONY, Garfield, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: SR-22

The SR-22 bridge in Garfield, Utah carries SR-22 over SEVIER IRRIGATION CANAL. It was built in 1994, making it 32 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 464 vehicles, placing it in the lower-traffic tier of Utah bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR-22 compares

▲ 4.0
Load rating vs Utah average (36.8 t)
Top 27%
Higher load rating than 73% of Utah bridges
94
Bridges in Garfield · 3 in Poor condition
SR-22 40.8 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
90.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
10.7
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Culvert
7/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1994
Material
Concrete
Number of Spans
1
Structure Length
9.1 m (30 ft)
Owner
State Highway Agency
Avg Daily Traffic
464 vehicles/day
Structure Number
0E2394

How to read this record

This page shows what the last federal inspection recorded, not whether SR-22 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR-22 against other structures in Garfield and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR-22?

SR-22 in Garfield, Utah on the FHWA's 0–9 scale.

How often is SR-22 inspected?

SR-22's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 464 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR-22 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR-22?

SR-22 has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining SR-22?

SR-22 is owned and maintained by State Highway Agency.

How old is SR-22 and does age affect safety?

SR-22 was built in 1994, making it 32 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.