FHWA NBI 2024 Inspection record Public-domain dataset

SELFORD ROAD

Carrying SELFORD ROAD over IS 95

0.13 MILE NORTH OF IS 195, Baltimore, Maryland

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: SELFORD ROAD

The SELFORD ROAD bridge in Baltimore, Maryland carries SELFORD ROAD over IS 95. It was built in 1970, making it 56 years old today. The structure is built primarily of steel continuous. Daily traffic averages 176,796 vehicles, placing it in the heavily-trafficked tier of Maryland bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. No reported major component scores in the Poor range under the current federal condition thresholds.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SELFORD ROAD compares

787
Bridges in Baltimore · 23 in Poor condition

Live comparison across Maryland.

Historical Sufficiency Rating

PlainBridge-computed
96.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.0
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Steel Continuous
Avg Daily Traffic
176,796 vehicles/day
Structure Number
100000030254010

How to read this record

This page shows what the last federal inspection recorded, not whether SELFORD ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SELFORD ROAD against other structures in Baltimore and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SELFORD ROAD?

SELFORD ROAD in Baltimore, Maryland on the FHWA's 0–9 scale.

How often is SELFORD ROAD inspected?

SELFORD ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 176,796 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SELFORD ROAD is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SELFORD ROAD?

An inventory load rating is not recorded for SELFORD ROAD.

Who is responsible for maintaining SELFORD ROAD?

Ownership is not specified for SELFORD ROAD in the NBI.

How old is SELFORD ROAD and does age affect safety?

SELFORD ROAD was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.