FHWA NBI 2024 Inspection record Public-domain dataset

C3081

Carrying C3081 over SOUTH PEACHAM BROOK

0.04 MI TO JCT W CL2 TH1, Caledonia, Vermont

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
15 t Inventory load rating

Bridge Snapshot: C3081

The C3081 bridge in Caledonia, Vermont carries C3081 over SOUTH PEACHAM BROOK. It was built in 1926, making it 100 years old today. The structure is built primarily of steel and spans 1 section, stretching 8.8 meters (29 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Vermont bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 14.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C3081 compares

▼ 22.2
Load rating vs Vermont average (36.7 t)
Bottom 8%
Lower load rating than 92% of Vermont bridges
251
Bridges in Caledonia · 4 in Poor condition
C3081 14.5 t
Vermont average 36.7 t

Live comparison across Vermont.

Historical Sufficiency Rating

PlainBridge-computed
41.2 / 100 - historical 20–49.9 band
Structural adequacy /55
20.4
Serviceability /30
6.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
14.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1926
Material
Steel
Number of Spans
1
Structure Length
8.8 m (29 ft)
Deck Width
5.9 m (19 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
150 vehicles/day
Structure Number
100301004203011

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

C3081 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare C3081 against other structures in Caledonia and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C3081?

C3081 in Caledonia, Vermont has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is C3081 inspected?

C3081's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C3081 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C3081?

C3081 has an NBI inventory load rating of 14.5 metric tons.

Who is responsible for maintaining C3081?

C3081 is owned and maintained by Town/Township Highway Agency.

How old is C3081 and does age affect safety?

C3081 was built in 1926, making it 100 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.