FHWA NBI 2024 Inspection record Public-domain dataset

C3008

Carrying C3008 over SLEEPERS RIVER

@ JCT W CL3 TH44, Caledonia, Vermont

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
15 t Inventory load rating

Bridge Snapshot: C3008

The C3008 bridge in Caledonia, Vermont carries C3008 over SLEEPERS RIVER. It was built in 1929, making it 97 years old today. The structure is built primarily of steel and spans 1 section, stretching 22.6 meters (74 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Vermont bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 14.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C3008 compares

▼ 22.2
Load rating vs Vermont average (36.7 t)
Bottom 8%
Lower load rating than 92% of Vermont bridges
251
Bridges in Caledonia · 4 in Poor condition
C3008 14.5 t
Vermont average 36.7 t

Live comparison across Vermont.

Historical Sufficiency Rating

PlainBridge-computed
45.2 / 100 - historical 20–49.9 band
Structural adequacy /55
20.4
Serviceability /30
10.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
14.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1929
Material
Steel
Number of Spans
1
Structure Length
22.6 m (74 ft)
Deck Width
7.3 m (24 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
500 vehicles/day
Structure Number
100311002703111

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether C3008 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C3008 against other structures in Caledonia and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C3008?

C3008 in Caledonia, Vermont has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is C3008 inspected?

C3008's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C3008 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C3008?

C3008 has an NBI inventory load rating of 14.5 metric tons.

Who is responsible for maintaining C3008?

C3008 is owned and maintained by Town/Township Highway Agency.

How old is C3008 and does age affect safety?

C3008 was built in 1929, making it 97 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.