FHWA NBI 2024 Inspection record Public-domain dataset

SHERIDAN GLCR ROAD

Carrying SHERIDAN GLCR ROAD over SHERIDAN CREEK

NO DATA ENTERED, Chugach, Alaska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
65 t Inventory load rating

Bridge Snapshot: SHERIDAN GLCR ROAD

The SHERIDAN GLCR ROAD bridge in Chugach, Alaska carries SHERIDAN GLCR ROAD over SHERIDAN CREEK. It was built in 2006, making it 20 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 14.0 meters (46 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 65.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SHERIDAN GLCR ROAD compares

▲ 30.3
Load rating vs Alaska average (34.8 t)
Top 6%
Higher load rating than 94% of Alaska bridges
18
Bridges in Chugach · 3 in Poor condition
SHERIDAN GLCR ROAD 65.1 t
Alaska average 34.8 t

Live comparison across Alaska.

Historical Sufficiency Rating

PlainBridge-computed
74.4 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
23.0
Essentiality /15
14.4
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
65.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Wood or Timber
Number of Spans
1
Structure Length
14.0 m (46 ft)
Deck Width
7.0 m (23 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
10 vehicles/day
Structure Number
100420000003052

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SHERIDAN GLCR ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SHERIDAN GLCR ROAD against other structures in Chugach and across Alaska. Alaska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SHERIDAN GLCR ROAD?

SHERIDAN GLCR ROAD in Chugach, Alaska has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SHERIDAN GLCR ROAD inspected?

SHERIDAN GLCR ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SHERIDAN GLCR ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SHERIDAN GLCR ROAD?

SHERIDAN GLCR ROAD has an NBI inventory load rating of 65.1 metric tons.

Who is responsible for maintaining SHERIDAN GLCR ROAD?

SHERIDAN GLCR ROAD is owned and maintained by U.S. Forest Service.

How old is SHERIDAN GLCR ROAD and does age affect safety?

SHERIDAN GLCR ROAD was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.