FHWA NBI 2024 Inspection record Public-domain dataset

C2005

Carrying C2005 over BRESEE MILL BROOK

0.01 MI TO JCT W CL2 TH9, Rutland, Vermont

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
76 t Inventory load rating

Bridge Snapshot: C2005

The C2005 bridge in Rutland, Vermont carries C2005 over BRESEE MILL BROOK. It was built in 1939, making it 87 years old today. It was last reconstructed in 1999, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 19.5 meters (64 feet) end to end. Daily traffic averages 250 vehicles, placing it in the lower-traffic tier of Vermont bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 76.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C2005 compares

▲ 39.5
Load rating vs Vermont average (36.7 t)
Top 2%
Higher load rating than 98% of Vermont bridges
275
Bridges in Rutland · 7 in Poor condition
C2005 76.2 t
Vermont average 36.7 t

Live comparison across Vermont.

Historical Sufficiency Rating

PlainBridge-computed
82.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
76.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1939
Last Reconstructed
1999
Material
Prestressed Concrete
Number of Spans
1
Structure Length
19.5 m (64 ft)
Deck Width
7.3 m (24 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
250 vehicles/day
Structure Number
101102001011021

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether C2005 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C2005 against other structures in Rutland and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C2005?

C2005 in Rutland, Vermont has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is C2005 inspected?

C2005's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 250 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C2005 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C2005?

C2005 has an NBI inventory load rating of 76.2 metric tons.

Who is responsible for maintaining C2005?

C2005 is owned and maintained by Town/Township Highway Agency.

How old is C2005 and does age affect safety?

C2005 was built in 1939, making it 87 years old and last reconstructed in 1999.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.