FHWA NBI 2024 Inspection record Public-domain dataset

C3065

Carrying C3065 over NORTH RIVER

0.1 MI JCT TH 65 & VT112, Windham, Vermont

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
83 t Inventory load rating

Bridge Snapshot: C3065

The C3065 bridge in Windham, Vermont carries C3065 over NORTH RIVER. It was built in 2013, making it 13 years old today. The structure is built primarily of steel and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Vermont bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 82.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C3065 compares

▲ 45.9
Load rating vs Vermont average (36.7 t)
Top 1%
Higher load rating than 99% of Vermont bridges
342
Bridges in Windham · 15 in Poor condition
C3065 82.6 t
Vermont average 36.7 t

Live comparison across Vermont.

Historical Sufficiency Rating

PlainBridge-computed
78.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
14.0
Essentiality /15
14.9
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
82.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Steel
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
4.7 m (15 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
10 vehicles/day
Structure Number
101321004513211

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether C3065 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C3065 against other structures in Windham and across Vermont. Vermont bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C3065?

C3065 in Windham, Vermont has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is C3065 inspected?

C3065's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C3065 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C3065?

C3065 has an NBI inventory load rating of 82.6 metric tons.

Who is responsible for maintaining C3065?

C3065 is owned and maintained by Town/Township Highway Agency.

How old is C3065 and does age affect safety?

C3065 was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.