FHWA NBI 2024 Inspection record Public-domain dataset

PIERCE AVE

Carrying PIERCE AVE over NW DRAINAGEWAY

0.05 MI E OF ROCKTON, Winnebago, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: PIERCE AVE

The PIERCE AVE bridge in Winnebago, Illinois carries PIERCE AVE over NW DRAINAGEWAY. It was built in 1962, making it 64 years old today. It was last reconstructed in 2012, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 9.9 meters (32 feet) end to end. Daily traffic averages 350 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 42.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PIERCE AVE compares

▲ 8.2
Load rating vs Illinois average (34.6 t)
Top 14%
Higher load rating than 86% of Illinois bridges
475
Bridges in Winnebago · 29 in Poor condition
PIERCE AVE 42.8 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1962
Last Reconstructed
2012
Material
Concrete
Number of Spans
1
Structure Length
9.9 m (32 ft)
Deck Width
12.9 m (42 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
350 vehicles/day
Structure Number
101600600000000

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PIERCE AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PIERCE AVE against other structures in Winnebago and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PIERCE AVE?

PIERCE AVE in Winnebago, Illinois has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PIERCE AVE inspected?

PIERCE AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 350 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PIERCE AVE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PIERCE AVE?

PIERCE AVE has an NBI inventory load rating of 42.8 metric tons.

Who is responsible for maintaining PIERCE AVE?

PIERCE AVE is owned and maintained by City/Municipal Highway Agency.

How old is PIERCE AVE and does age affect safety?

PIERCE AVE was built in 1962, making it 64 years old and last reconstructed in 2012.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.