FHWA NBI 2024 Inspection record Public-domain dataset

BULLARD PARKWAY WB

Carrying BULLARD PARKWAY WB over HILLSBOROUGH RIVER

1.0MI E OF 56TH STREET, Hillsborough, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating

Bridge Snapshot: BULLARD PARKWAY WB

The BULLARD PARKWAY WB bridge in Hillsborough, Florida carries BULLARD PARKWAY WB over HILLSBOROUGH RIVER. It was built in 2000, making it 26 years old today. The structure is built primarily of prestressed concrete and spans 8 sections, stretching 129.1 meters (424 feet) end to end. Daily traffic averages 22,000 vehicles, placing it in the heavily-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 42.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BULLARD PARKWAY WB compares

▲ 3.5
Load rating vs Florida average (38.9 t)
Top 30%
Higher load rating than 70% of Florida bridges
840
Bridges in Hillsborough · 2 in Poor condition
BULLARD PARKWAY WB 42.4 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
81.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
13.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2000
Material
Prestressed Concrete
Number of Spans
8
Structure Length
129.1 m (424 ft)
Deck Width
12.2 m (40 ft)
Owner
County Highway Agency
Avg Daily Traffic
22,000 vehicles/day
Structure Number
104144

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether BULLARD PARKWAY WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BULLARD PARKWAY WB against other structures in Hillsborough and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BULLARD PARKWAY WB?

BULLARD PARKWAY WB in Hillsborough, Florida has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BULLARD PARKWAY WB inspected?

BULLARD PARKWAY WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BULLARD PARKWAY WB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BULLARD PARKWAY WB?

BULLARD PARKWAY WB has an NBI inventory load rating of 42.4 metric tons.

Who is responsible for maintaining BULLARD PARKWAY WB?

BULLARD PARKWAY WB is owned and maintained by County Highway Agency.

How old is BULLARD PARKWAY WB and does age affect safety?

BULLARD PARKWAY WB was built in 2000, making it 26 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.